Catapult Mentoring Group
  • Home
  • CMG LAUNCH PAD
  • FACILITATE GROUP
  • God's 10%
  • >GROW YOUR WEALTH HERE<
  • Taekwondo Classes
  • Drop Ship’in
  • Sophomore 1st Semester
  • Mentee Journaling
  • MID-TERM ELECTION RULES
  • THEOLOGY PSY
  • PULL/PUSH= DMAIC
  • Freedom Acres Ranch Link
  • More
    • Home
    • CMG LAUNCH PAD
    • FACILITATE GROUP
    • God's 10%
    • >GROW YOUR WEALTH HERE<
    • Taekwondo Classes
    • Drop Ship’in
    • Sophomore 1st Semester
    • Mentee Journaling
    • MID-TERM ELECTION RULES
    • THEOLOGY PSY
    • PULL/PUSH= DMAIC
    • Freedom Acres Ranch Link
Catapult Mentoring Group
MID-TERM VOTING INSTRUCTIONS
  • Home
  • CMG LAUNCH PAD
  • FACILITATE GROUP
  • God's 10%
  • >GROW YOUR WEALTH HERE<
  • Taekwondo Classes
  • Drop Ship’in
  • Sophomore 1st Semester
  • Mentee Journaling
  • MID-TERM ELECTION RULES
  • THEOLOGY PSY
  • PULL/PUSH= DMAIC
  • Freedom Acres Ranch Link
MID-TERM VOTING INSTRUCTIONS

DMAIC cf., to A3

DMAIC
is a foundational, data-intensive project methodology primarily utilized within the Six Sigma domain to systematically improve, optimize, and stabilize existing business processes.

Conversely, an A3 report provides a highly concise, visual overview typically limited to a single page, maximizing collaboration and quick communication rooted in Lean thinking. 


The visual rendering below reflects these structured concepts juxtaposed alongside a metaphorical strategic chess match observed by global lead

DMAIC Phase =| A3 Equivalent / Focus


Define             = Condition/ 


Measure        = Problem Statement 

                         £Initial Target/ Baseline


Analyze       = Root Cause AnalAnalysis   


Improve            | Proposed Countermeasures


Control              | Follow-up Action & 

                           Standardized Plans





         

                       

  • DMAIC: Built for complex, chronic, or vague process variations that require deep statistical analysis (such as regression or hypothesis testing).
  • A3: Designed for straightforward, well-defined problems or localized issues that can be captured and resolved rapidly. 

Timeframe:

  • DMAIC: Typically spans 3 to 6 months as a formal project.
  • A3: Completed much faster, ranging from a few days to a couple of weeks…

Documentation Format:

  • DMAIC: Generates extensive project documentation, data sets, and control plans.
  • A3: Fits the entire narrative—from background and root cause to countermeasures and follow-up—on a single 11x17 inch sheet of paper…

Core Focus:

  • DMAIC: Emphasizes reducing statistical defects and variation through strict data governance.
  • A3: Emphasizes visual management, collaborative storytelling, and team consensus-building…

Which methodology do you prefer? DMAIC/A3
DMAIC (Corporate / A3 Report (Government)


“I personally prefer DMAIC”!


R/

CMG CEO

Pull/Push Theory

The three core components—or pillars—of the push-pull supply chain theory are the push process, the pull process, and the push-pull boundary.


.1. The Push Process (Forecast-Driven)

  • Definition: Activities in the supply chain start before actual customer orders arrive.
  • How it works: Companies use past sales data and market analytics to predict future demand. They buy raw materials and build products ahead of time.
  • Goal: Achieve economies of scale and lower production costs through bulk manufacturing.

DMAIC is a five-phase, data-driven problem-solving framework used in Lean Six Sigma to improve, optimize, and stabilize existing business processes. The acronym stands for Define, Measure, Analyze, Improve, and Control

Define

  • Identify the core problem, project goals, and customer requirements.
  • Write a project charter and map out the initial process.

Measure

  • Collect data to find out how the process performs right now.
  • Build a baseline to see the size of the gap. 

Analyze

  • Look at the data to find the real root cause of the issue.
  • Test ideas and remove extra waste or steps. 

Improve

  • Create and test new fixes for the problem.
  • Put the best solutions in place to fix the root cause.

Control

  • Watch the new process to make sure it keeps working well.
  • Set up new rules so the old problems do not come back.

Copyright © 2026 Catapult Mentoring Group  - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept